Case Studies


Shockey 16 e1543938160465

Shockey Precast Goes Underground in Philly

The PennFIRST Patient Pavilion underground parking structure began as a feasibility question posed to Shockey Precast’s Vice President of Engineering. Could an underground precast concrete parking garage ultimately support the 1.5 million square-foot patient pavilion that was to be constructed above it? After in-depth study and evaluation, the answer was a resounding “Yes” and Shockey […]

Read More
WMAta Andrews Federal Bus Facility erection 80 wide view

WMATA Andrews Federal Bus Facility

In 2015, Hensel Phelps Construction contracted The Shockey Precast Group to design and erect the WMATA Andrews Federal Bus Facility in District Heights, Maryland. The precast scope of work featured 112,000 SF of architectural precast, with an exterior façade that included ribbons of both brick and architectural mixes to match the design of other WMATA […]

Read More
Silver Line Final 4

MWAA Rail Yard and Maintenance Facility

The Metropolitan Washington Airports Authority (MWAA) Rail Yard and Maintenance Facility in Dulles, VA is part of the Silver Line Corridor project. In 2015, The Shockey Precast Group (SPG) was contracted by Hensel Phelps Construction to design, manufacture, and erect approximately 180,000 SF of precast insulated wall panels for the project. The scope of work […]

Read More
Navy Federal Credit Union PS

Navy Federal Credit Union Parking Structure & Office Building

The Navy Federal Credit Union Parking Structure and Office Building project in Vienna, VA included design and construction of both an office building and a six-level parking structure with 1,062 spaces. Packaged as a single project, the office building and parking structure include shared features such as vertical brick, multiple finishes and colors, and architectural […]

Read More
Carrollton Station PS erection

New Carrollton Station Parking Garage

Designed to serve the mixed-use development of New Carrollton Station, the New Carrollton Station Parking Structure is a 272,317-SF garage providing 971 parking spaces to retail patrons and the adjacent residential community. The Shockey Precast Group served as a design-build partner on the project, which was designed to accommodate a two-level vertical expansion and features […]

Read More
Valley Health System PS

Return on Investment: Maximizing the Life of Your Precast Parking Structure

A precast parking structure represents a significant financial investment, and ensuring its longevity is paramount to maximizing the return on your investment. The Shockey Precast Group is able to provide parking structures that meet a 50-year life expectancy; however, achieving that life expectancy is dependent upon the owner following a regular schedule of maintenance activities. […]

Read More
SU Fieldhouse precast complete

Shenandoah University Athletic Field House

The Shenandoah University Athletic Field House began as a structural steel concept, with a high, unobstructed space for basketball, volleyball, concerts, and indoor track and field, and a clear roof span across the event floor of almost 180 feet. The concept called for a structural steel perimeter framing that would carry 10-12 feet deep open […]

Read More
Tapestry Apartments PS aerial1

Tapestry Annapolis Apartments Parking Structure

The Tapestry Annapolis Apartments Parking Structure, located in Annapolis, Maryland, is a seven-level, 392- space, 206,390 SF precast garage with several unique design elements that required special consideration for SPG’s engineering, production, and erection teams. SPG served as a design-assist partner to Lennar Multifamily Communities, providing engineering guidance in the overall design of the structure, […]

Read More