Project Overview

Designed to meet the needs of both students and non-students in the community, The Metropolitan at State College is a 12-story, U-shaped mixed-use building with urban convenience. The building combines a total of 132 residential units with office space, 40,000+ SF of retail/amenity space and three levels of underground structured parking.

The Metropolitan was initially designed with a cast-in-place (CIP) concrete basement retaining wall system, precast garage, and CIP shear towers from the basement to roof level. Levels 1, 2, and 3 of the structure were also originally designed as CIP. Above the podium, the design for the upper levels (above level 3) included a girder slab system – a structural steel skeleton with hollowcore. With the CIP basement retaining wall up and the garage precast below grade in the process of being erected, the project went over budget. Metromont was approached by the owners to provide pricing for a conversion from CIP to precast. Metromont’s conversion to precast saved 10% of the total project cost. The new design features precast below grade and although the first level remained CIP, vertical levels 1-3 became precast, level two was converted to precast, and level three was redesigned as a series of transfer beams into a precast deck. The new design also includes shear towers to level three, but the shear towers from levels 3-13 were converted to Metromont’s total precast MetroDeck floor system that saved time and money. Metromont’s design includes a rooftop amenity level with swimming pool, two spas, and a jumbotron. All total, the conversion resulted in 12 levels of total precast (163,331 SF) and 32,662 SF of combined systems. The structure’s façade features an integrated architectural precast mix with curved panels and continuous insulation.

Metromont produced and erected 997 pieces of precast for The Metropolitan, including 109,398 SF of wall panels and 159,461 SF of 8” deep MetroDeck system. Precast erection began in September 2016 and was completed in March 2017. Architectural details and finishes include medium sandblast finish with a limestone color and cast-in thin brick.

Project Details

12-level total precast system
109,398 SF of wall panels
8” MetroDeck floor system
997 total precast concrete pieces
Erected in six (6) months

Architectural Details & Finishes

Limestone colored concrete mix with medium sandblast finish
Cast-in thin brick

Do you have a similar project?

We’d love to hear more about it and answer any questions you have.

"Metromont was an excellent partner and worked seamlessly, closely to collaborate almost as an extension of our design team. It’s incredible how quickly it all came together.”
Scott Johnston
AIA Johnston Design Group
"The precast concrete design was able to meet the stringent performance requirements of the structure while providing an aesthetically pleasing, sustainable final product at an affordable price point."
Ben Townes
Townes + Architects
"Metromont’s team embraced our idea and got their whole team on board. It’s one thing for sales managers to want to make architects happy, but to have the plant manager, the finishing crew foreman and engineers fully engaged is something else. Metromont was extremely cooperative – the project was a win-win for everyone.”
K.J. Jacobs, AIA
McMillan Pazdan Smith

Let's Discuss Your Project

Our industry-leading experts are ready to answer your questions and put our proven experience to work for you. Contact us today and let’s discuss the ins and outs of your project.

Name(Required)
This field is for validation purposes and should be left unchanged.
Precast Concrete Manufacturing

The Standard at New Brunswick

New Brunswick, NJ

The Standard at State College

State College, PA

Cornell University Student Housing

Ithaca, NY

Locks Tower

Richmond, VA

South Falls Towers and Garage

Richmond, VA