The Valley Health Cancer Center features 13,466 SF of two- story architectural precast walls with punched window openings. The panels were finished with a combination of acid-washed architectural mix and thin-brick. Precast for the Cancer Center was erected from inside the building footprint to shore the panels to the perimeter slab-on-grade, prior to erection of the supporting steel, which was captured by the precast and erected by the Shockey Precast crew. The precast scope of work also included two pedestrian bridges.